Chrysses Demetriades Building

Client: Chrysses Demetriades & Co. LLC
Project start/completion: 2009 – 2011
Architect: George Stamatiou
Mechanical Consultant: Hiteco Engineering Ltd
Main Contractor: Stavros Demosthenous Ltd
Mechanical Contractor: Hydrothermiki Ltd

Brief Description of the building:

A 5,800m2 office area building on a total of 7 levels, two basements and 5 floors situated in the heart of Limassol.

Mechanical Services

Cooling / Heating Plant:

Generally 3-pipe VRV systems (heating/cooling) serve the office areas.

8no. air handling units provide conditioned fresh air to the building and air conditioning to the cafeteria and auditorium. Solar heated water is stored and used for absorption cooling and the domestic hot water requirements of the building.

Fire Protection

There is a sprinkler system installed in all main areas. Specific areas like the Server room are protected from an inert gas extinguishing system (FM-200)